Looking to play on Brampton’s newest turf field?

imgp4216

As well as the Footy Sevens adult soccer leagues and kids program, the new field at Heart Lake Secondary School, 296 Conestoga Drive, Brampton will also be available for rentals. Both the full field and the 60×30 mini fields will be rentable.

The field is available for rental from 8am to 11pm on Saturday and Sunday and from 6-11pm on weeknights. Most of the availability is on Saturdays and only limited time is available midweek. Contact Chris at chris@footysevens.com for all rental enquiries.

Field Details:

Field Dimensions:

Full Size Soccer Field: 100m (109 yards) x 64m (70 yards)

Other Sports: Also lined for rugby and lacrosse

4 x Small Sided Soccer Fields: 60m x 29.5m.

Small sided soccer fields are separated by full length divider netting system

All fields are permanently lined and have Kwik Goal premium quality goals and nets.

Field Surface:

Fieldturf’s Revolution 360 Turf: http://www.fieldturf.com/de/products/revolution-360-the-complete-fiber

Fieldturf’s Revolution 360 turf had been chosen for its combination of the best possible combination of playability, safety and durability.  It meets both the FIFA Quality and FIFA Quality Pro testing standards and has been installed on the home fields of the Seattle Sounders, New England Revolution, Miami FC and Portland Timbers of the MLS and both Superbowl teams, the New England Patriots and Atlanta Falcons.

Floodlighting:

Floodlit with Ephesus All Field Series LED lighting system http://ephesuslighting.com/product/field-series/

 

Other Information:

  • Parking: Yes, free parking on site.
  • Bleachers: Yes permanent bleachers on west of the field
  • Divider Nets: Divider nets are in place between 7v7 field but are removed for full field play.

Location:

Google Maps

Heart Lake Secondary School

296 Conestoga Road

Brampton, ON

L6Z 3M1

Rental Rates:

Full Field: $180 per hour

Small Sided Soccer Fields: $60 per hour including sets of small-sided goals and field divider netting.

Construction:

The field is currently under construction and remains on schedule for a mid-August completion/opening date. We will be posting updates on the construction every couple of weeks on torontofootyblog.com.

Latest Post

Construction completion/field open from: Mid-August 2017

More Information:

Peel District School Board Press Release: http://www.peelschools.org/media/newsreleases/Pages/Article.aspx?art-id=1772

Footy Sevens Website: toronto.footysevens.com

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s